Skip to main content

ENVIS 1.2 Updated

A significant maintenance update 44 has been released for ENVIS v1.2. Residual current monitoring (RCM), min/max data analysis and other functionalities have been added. Version 44 also fixes known problem with database and the ENVIS.Online backend. Before upgrade from any previous version do backup your data and uninstall the previous version(s) of ENVIS. It is also highly recommended to uprade instruments firmware together with ENVIS. In case of any doubts do contact our technical support prior to the update. 

Comments

Popular posts from this blog

Portable power quality analyser SMY-CA

We have released a new portable instrument in robust case for measurements in harsh environments. It is a SMY 133 based instrument for energy and power quality monitoring with internal memory, large color graphics display and also with remote communication (Ethernet). Its outer dimmensions are relatively compact and the whole case can be closed and locked during the actual measurement operation. So it can be simply used for longer campaigns within various cabinets without the need to leave the cabinet door open. Futher details can be found here:  http://kmb.cz/index.php/en/portable-meters

ENVIS 1.1 release note

The development of ENVIS 1.1 has been finished and the product will be released during November 2012 following the intensive testing. Final installation package will be published on the web site  accordingly.